The laboratories occupy the major part of the building, on four stories. All laboratory floors are organised according to a standard section, the offices occupying the street frontage, with ducted and piped services running in a double glazed wall on the opposite face. The space between these two zones provides the maximum possible area for flexible laboratory layout and an energy saving environmental control system to the building.
Externally, the fenestration of the office spaces is designed to the scale and character of the neighbouring buildings, and finishes in similar materials, while the fully glazed and more technologically explicit surfaces face onto the private area of the site.
Credit
- Competition Winning Entry 1986

